As a Resident, I have no problem with the current works in the estate regarding the laying of pipes for the Water scheme. However, if the road is going to be dug up then it should be laid back properly the way it was found before hand.

The road that was relaid at the end of the Avenue going towards the View is pretty unacceptable as it doesn't seem to have been relaid properly. I rang Dunlaoghaire Rathdown C.C today and they were very approachable and said they were going to speak to the road engineer about it, so hopefully they will relay our roads properly!